News

IFT carry out screeding works on the Isle of Bute

16th July 2019

IFT carry out screeding works on the Isle of Bute

IFT was appointed by specialist fit-out contractor Thomas Johnstone, along with Fusion Mechanical Services Ltd, to install flooring at Ardscalpsie Farm on the Isle of Bute. The IFT team carried out screeding works on both heated and non-heated areas at this private residential project on the Isle of Bute.

Read more
IFT installs screed and floor finishes at former Egg Shed in Ardrishaig

3rd July 2019

IFT installs screed and floor finishes at former Egg Shed in Ardrishaig

IFT was appointed by Anderson Floor Warming And Renewables to install the screed and floor / internal wall finishes onto their underfloor heating system at the former Egg Shed building next to Pier Square in Ardrishaig. The site’s location on the side of the loch, close to the harbour, meant it suited storage of local…

Read more